ALTHORPE STATION

Layher Footbridge at Althorpe Station.

The temporary footbridge will replace the existing footbridge for pedestrian access across the track. 

The bridge was lifted into position in under 2 hours and secured to the pre-built staircases. 

The whole assembly is fully compliant with public access and Network Rail regulations. 