Arla Dairy, Leeds

Crossway built hygienic scaffold platforms with plastic boards and flame-retardant sheeting to capture debris from drilling through upper floor for services, and over multi-million-pound machinery being installed at the same time. 

We also built a 10 tonne loading platform with temporary staircase to facilitate loading of heavy vessels and machinery into the new plant and an internal screen to isolate work areas from main production areas.

Arla (1)
Arla
Arla 2