ARLA DAIRY
Arla Dairy, Leeds
Crossway built hygienic scaffold platforms with plastic boards and flame-retardant sheeting to capture debris from drilling through upper floor for services, and over multi-million-pound machinery being installed at the same time.
We also built a 10 tonne loading platform with temporary staircase to facilitate loading of heavy vessels and machinery into the new plant and an internal screen to isolate work areas from main production areas.


